Job Location
Virginia
Tysons, VA
Date Posted
May 8, 2026

Experienced Project Planner

We are seeking an experienced Project Planner who is driven and takes pride in technical precision and production quality. The successful candidate will work on a variety of land development projects as part of a multi-disciplined design team that includes civil engineers, planners, and landscape architects. Working closely with Senior Planners, Landscape Architects, and Project Managers, you will help lead CADD production efforts in the Planning Department and play a key role in translating preliminary design concepts into accurate, high-quality entitlement documents. This is an in-office position based at our Tyson, Virginia office.

Experienced Project Planner

VIKA is a full-service Civil Engineering and Site Development consulting firm providing engineering, planning, surveys, landscape architecture, transportation, dry utility engineering, and subsurface utility engineering services throughout the Mid-Atlantic region and Northern Florida. Supported by our 180+ staff members, we deliver enhanced resources and expertise to serve our clients' diverse project needs. As a fast-paced, dynamic land development firm, VIKA fosters a team-oriented environment where staff members benefit from comprehensive learning opportunities and advancement potential while being inspired to make independent decisions and excel in a respectful, highly motivating workplace.

We are seeking an experienced Project Planner who is driven and takes pride in technical precision and production quality. The successful candidate will work on a variety of land development projects as part of a multi-disciplined design team that includes civil engineers, planners, and landscape architects. Working closely with Senior Planners, Landscape Architects, and Project Managers, you will help lead CADD production efforts in the Planning Department and play a key role in translating preliminary design concepts into accurate, high-quality entitlement documents.

This is an in-office position based at our Tyson, Virginia office.

What We Hope You Will Bring

  • Advanced knowledge of AutoCAD (Civil 3D preferred)
  • 3-5 years’  direct experience preparing entitlement drawings  
  • Technical proficiency in AutoCAD (Civil 3D preferred); water, sewer, and general utility design; roadway, and related site design including cross sections; using and manipulating aerial and topographic map files; and preparing entitlement     documents. Ability to research and analyze local zoning codes, land use regulations, and environmental laws and to apply them to assigned projects.    
  • Proficiency in MS Office Suite (MS Outlook, MS Excel, MS Word)
  • Strong written and verbal communication skills
  • Strong organizational and time management skills

Your Impact

·        Design Leadership: Lead CADD operations with proficiency in AutoCAD (Civil 3D preferred) while preparing complex planning entitlement drawings.

·        Advanced Technical Production: Demonstrate advanced experience in all aspects of CADD design, preparing planning entitlement drawings in full conformance with VIKA's CADD and design requirements.

·        Project Coordination: Lead coordination efforts with VIKA Planning, Landscape Architecture, and Engineering staff and outside consultants including Land Use Attorneys, Architects, Landscape Architects, and Dry Utility Engineers while preparing planning entitlement documents for assigned project development phases.

Benefits
VIKA is proud to offer a broad range of benefits including:

  • Health, Vision & Dental Insurance
  • 401(k), including potential profit sharing
  • Flexible Spending Account (Health, Dependent & Transit)
  • Generous PTO including holidays, vacation, personal leave and community service days
  • Biannual Bonuses
  • Tuition Reimbursement
  • Professional Development Support
  • Advancement Opportunities

The anticipated salary range for this position is $70,000 – $80,000. Actual compensation will be determined based on experience, qualifications, and other job-related factors, in accordance with applicable law.

Application Process: Qualified candidates should submit a detailed resume to: employment@vika.com

VIKA is an Equal Opportunity Employer and does not discriminate on the basis of race, national origin, religion, color, gender, sexual orientation, age, physical or mental disability, veteran status, or any other characteristic protected by applicable law.

Multiple Locations to Serve You

Find out more about each of our office locations.

Washington, DC
Maryland
Virginia
Florida